女生自慰网站,91乱伦中文字幕乱伦,亚洲五月婷婷,午夜爱爱爱爱

High quality hydraulic equipment manufacturers!
TELL:+8613184968882

tailboard balance cylinder Sold to Nepal

Release time:2023-11-16 08:44:27 Hits: Current position: Home > News

This article mainly introduces:

Nepal hydraulic cylinder,tailboard balance cylinder manufacturer,tailboard balance cylinder

Nepal tailboard balance cylinder

(Nepal tailboard balance cylinder,produced by Hengyu Hydraulic Cylinder Factory)

tailboard balance cylinder are widely used in Nepal,because of excellent fatigue and impact resistance,no need for deceleration device,long service life.So our company has designed tailboard balance cylinder for customers from Nepal.

Introduction to tailboard balance cylinder:

The daily inspection of the tailboard balance cylinder includes: checking the connection of the tailboard balance cylinder and the pipe joint for leaks. Check the tailboard balance cylinder rod for leaks. Check the tailboard balance cylinder connection for leaks. When the tailboard balance cylinder moves, the work is normal and smooth. Whether the tailboard balance cylinder has internal leakage.

The definition of the minimum stable speed refers to the minimum movement speed of the tailboard balance cylinder without crawling phenomenon when the full load is moving, it has no uniform indicator, and the tailboard balance cylinder that undertakes different work has different requirements for the minimum stable speed.

tailboard balance cylinder abnormal sound, hysteresis phenomenon cause and elimination method: the piston rod is extended with abnormal sound and hysteresis, if the tailboard balance cylinder is placed for a period of time, the tailboard balance cylinder may enter the air, and the movement can be normal after dozens of repeated movements. If it still cannot be eliminated, check whether the load is aligned with the axis of the piston rod; Retracted piston rod installation helps to align the load with the piston rod. If the flow is unstable, it will also lead to abnormal movement of the piston rod. Check the relevant components of the hydraulic system.

Before the tailboard balance cylinder is removed, the relief valve should be loosened to reduce the pressure of the hydraulic circuit to zero, and then the power supply should be cut off to stop the hydraulic device. After loosening the oil port piping, the oil plug should be applied to plug the oil port.

Answers to some questions about tailboard balance cylinder:

What are the cylinder manufacturing processes?
Hydraulic cylinder processing process: 1, cylinder: a, material preparation (seamless steel pipe) → inspection (material certificate, etc.) → tempering (outsourcing: Some parts) → car (car round, shelf mouth, boring, flange stop, etc.) → tempered hardness test → welding (welded pipe joint base, flange and other accessories) → boring or honing (rough boring, fine boring, rolling) → car (hole slot or internal and external thread) → fitter (drilling) → inspection → rust prevention storage b, material preparation (forgings) → inspection (material certificate, inspection, etc.) → welding (blank butt welding) → welding inspection → car (rough car) → quality control (outsourcing: some parts) → car (car round, shelf mouth, boring stop, flange stop, etc.)

How to remove the cylinder correctly?
(1) Before disassembling the hydraulic cylinder, the hydraulic circuit should be depressurized. Otherwise, when the tubing joint connected with the cylinder is loosened, the high-pressure oil in the circuit will be quickly ejected. The hydraulic circuit of the hydraulic press should first loosen the hand wheel or pressure regulator screw at the relief valve, so that the pressure oil is unloaded, and then block the power supply or block the power source to stop the operation of the hydraulic equipment. (2) When disassembling, it should prevent damage to the top thread of the piston rod, the oil thread, the appearance of the piston rod, the inner wall of the cylinder liner, etc. In order to prevent the piston rod and other slender parts from twisting or deformation, the use of cushion wood support balance when placed. (3) Disassemble in order.

Back to list Recommended article

Leave a message if you have any questions.

Send
Email

Email:hsslrubbertech@gmail.com7x24 hours

Glad to receive your consultation!:

Service
Tel

+8613184968882
7x24hours service

Add
Wechat

Add Wechat
TOP
www.伊人| 亚洲日韩欧美综合在线| 午夜人人精品| www.4438亚洲最大| www.婷婷亚洲基地| 新津县| 亚洲玖玖视频| 三级三级久久三级久久| 国色天香婷婷综合网| 懂色av懂色aⅴ精彩av| H电影在线| 云林县| 天天看高清无码大片| 久久97人人超人人超碰超国产| 江安县| www.4438亚洲最大| 国产真实乱对白精彩久久| 精品国产福利久久久| 国产成人无码17c100| 欧美国产aaaa| 熟女天天干| 精品中文字幕免费无码不卡视频| 国产第一成网站| 超碰97资源站| 亚洲婷色| 天堂成人精品社区| 99中文字幕在线在线| 1区中文字幕| 南丹县| 在线视频亚在线视频| 中文字幕女同女同女同| 玖玖视频| 你懂得视频资源| 日本阿v视频| 免费人成无码大片在线观看| 久一二区| 通许县| 中文字幕欧美一区| 亚洲精品国产日韩欧美| 日韩少妇九九九| 国产777777|